Sperta System

MBR Membrane Case Reference

Check out our work

SPERTA Flat Sheet MBR Membrane Factory Tour

SPERTA Hollow Fiber MBR Membrane Factory Tour

SPERTA Stainless Steel Type MBR Membrane Installation

SPERTA Union Type MBR Membrane Installation

How to Clean the MBR Membrane?

Pilot MBR System – How does MBR Membrane work?

SPERTA MBR Membrane Workshop

SPERTA Flat Sheet MBR Manufactuer I
SPERTA Flat Sheet MBR Manufactuer II
SPERTA Flat Sheet MBR Manufactuer IV
SPERTA Flat Sheet MBR Manufactuer III
SPERTA Flat Sheet MBR Manufactuer V
SPERTA Flat Sheet MBR Manufactuer VI

More Cases for reference

Case 1: Municipal Sewage Treatment

MBR Reference I

Kunming City, Yunnan Province, China

Project Capacity: 60,000m3/day

Running time: Since November 2018

Technology: Grille > Cyclone sedimentation tank > Anaerobic tank > Anoxic tank > Facultative tank > Aerobic tank > Membrane tank > Clear water tank

Effluent standard: Chinese 1A Standard in waste water

Stable operation since installed.

Case 2:  Municipal Sewage Treatment

MBR Reference II

Tongzhou, Beijing, China

Project Capacity: 40,000m3/day     (Peak: 56,000 m3/d)

Running time: Since January 2019

Technology: Grille > Cyclone sedimentation tank > Anaerobic tank > Anoxic tank > Facultative tank > Aerobic tank > Membrane tank > Clear water tank

Effluent standard: Below Table (B Emission Limits) of Beijing Local Standard DB11/307-2013 “Comprehensive Water Pollution Discharge Standards”

Standard (mg/L)

COD

BOD

Ammonia  Nitrogen

Total  Nitrogen

Total  Phosphorus

Raw water

350-500

180

45-55

30

6-9

Emission  Requirements

≤30

≤6

≤1.5(2.5)

≤15

≤0.3

Permeate  Water

26

4.7

0.58

8

0.11

Case 3:  Municipal Sewage Treatment

MBR Reference III

Huairou District, Beijing, China

Project Capacity: 4,500m3/day

Running time: Since October 2017

Technology: Grille > Anaerobic tank > Anoxic tank > Aerobic tank > MBR membrane tank > Clean water tank

Effluent standard: Below Table  (A Emission Limit) of Beijing Local Standard DB11/307-2013 “Comprehensive Water Pollution Discharge Standard”

Stable operation since installed.

Standard (mg/L)

COD

BOD

Ammonia  Nitrogen

Total  Nitrogen

Total  Phosphorus

Raw Water

480

240

25

40

8

Emission  Requirements

≤20

≤4

≤1(1.5)

≤10

≤0.2

Permeate  Water

18

3

0.5

6

0.13

Case 4:  Municipal Sewage Treatment

MBR Reference IV

Tongzhou District, Beijing, China

Project Capacity: 5,000m3/day

Running time: Since November 2016

Technology: Grille > Swirling sand settlement tank > Anaerobic tank > Anaerobic tank > Facultative tank > Aerobic tank > Membrane tank > Clean water tank

Effluent standard: Below table (B Emission Limits) of Beijing Local Standard DB11/307-2013 “Comprehensive Water Pollution Discharge Standards”

Standard (mg/L)

COD

BOD

Ammonia  Nitrogen

Total  Nitrogen

Total  Phosphorus

Raw Water

350-550

230

45-55

35

6-9

Emission  Requirements

≤30

≤6

≤1.5(2.5)

≤15

≤0.3

Permeate  Water

26

4.7

0.58

9

0.19

Case 5:  Industrial Wastewater Treatment

MBR Reference V

Tongzhou, Beijing, China

Project Capacity: 6,000m3/day    

Running time: May 2016  (Life Cycle: 2-3 Years)

Technology: Regulating tank > Hydrolysis > Sedimentation > Aerobic > Eedimentation > BAF tank > MBR membrane tank > RO

Effluent standard: Meet the discharge standard of water pollutants for textile dyeing and finishing industry (GB 4287- 2012)

Case 6:  Chemical Wastewater Treatment

MBR Reference VII

Wanhua Chemical Group Co., Ltd.

Project Capacity: 3,800m3/day

MBR Reference VIII

Changzhi City, Shanxi Province, China

Project Capacity: 4,800m3/day

Case 7:  Printing and dyeing Wastewater Treatment

MBR Reference IX

Shaoxing City, Zhejiang Province, China

Project Capacity: 6,000m3/day

Case 8:  Grinding Wastewater Treatment

MBR Reference XI

Zhongshan City, Guangdong Province, China

Project Capacity: 1,200m3/day

Case 9:  Circuit board Wastewater Treatment

MBR Reference XIII

Huizhou City, Guangdong Province, China

Project Capacity: 1,000m3/day

Case 10:  Chemical Wastewater Treatment

MBR Reference VIX
MBR Reference VX

Beijing Huiyuan Juice project, China

Project Capacity:  4,800m3/day

Project References From Distributors

NameCapacityLocation
Central Institute of Plastics Engineering and Technology25 m3/dAhmedabad, Gujarat
Rolex Rings Private Limited50 m3/dRajkot, Gujarat
Vashval Tex and Fabrics150 m3/dSurat, Gujarat
KSP Hydro Engineers Private Limited10 m3/dJaipur, Rajasthan
Wanderer Brewery Pvt. Ltd.30 m3/dBengaluru, Karnataka
Suyog Hospital100 m3/dMysore, Karnataka
Ashirvad Pipes Pvt. Ltd.30 m3/dBhiwadi, Rajasthan
Niksha Water Engineering Private Limited30 m3/dBengaluru, Karnataka
Shatayu Hospital20 m3/dKolhapur, Maharashtra
Kalyani Group5 m3/dBengaluru, Karnataka
Ashirvad Pipes Pvt. Ltd.9 m3/Hour WTPBhiwadi, Rajasthan
Monarch Constructions50 m3/dOttapalyam, Kerala
Padipura Hotels10 m3/dKollam, Kerala
Three Star Hotel Project20 m3/dJunagadh, Gujarat
Shree Ram Chandra Children Hospital20 m3/dGuntur, Andhra Pradesh
Mana Seldon Residency40 m3/dBengaluru, Karnataka
CMRIT College85 m3/dBengaluru, Karnataka
Sentossa Greens-2 by Sanskruti Developers20 m3/dAhmedabad, Gujarat
Hotel Rajdoot50 m3/dKolhapur, Maharashtra
APDV Construction10 m3/dGoa, India
Jog Envirotech1 m3/hr WTPGoa, India